Assisted management of radio resources across dual networks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9807651
SERIAL NO

13605898

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A user equipment (UE) operating in a communication system comprising a base station and one or more UEs. The UE may be configured to operate on or “camp” on two different networks with one radio. In this exemplary system, the radio may be normally connected to the first network (NW1) and may from time to time be “tuned away” from NW1 to a second network (NW2). The UE may inform NW1 that it has tuned away to another network, e.g., using start and end indicators. This information may prevent NW1 from wasting downlink capacity by unnecessarily allocating downlink resources to the UE during the tune-away. Alternatively, or in addition, this information may prevent NW1 from penalizing the UE, e.g., by reducing its future downlink allocations, since the UE does not respond to NW1 commands during the tune-away.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • APPLE INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Flynn, Paul V Menlo Park, US 43 714
Mujtaba, Syed Aon Santa Clara, US 133 1896
Song, Kee-Bong Santa Clara, US 124 1107
Tabet, Tarik Los Gatos, US 284 2701

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00