Nozzle for dissolved air flotation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9808810
APP PUB NO 20150182977A1
SERIAL NO

14538226

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nozzle for a dissolved air flotation system includes a housing, a nozzle connector, and a nozzle body. The housing has an inlet formed at one side and an outlet formed at another side. The nozzle connector couples to the inlet and has an inflow path formed in a longitudinal direction. The nozzle body is disposed in the housing, and includes: a collision portion formed at a first end portion of the nozzle body such that a fluid introduced along the inflow path of the nozzle connector 10 changes its flow direction and collides with an inner wall of a side portion of the housing, a plurality of faces formed at sides of the nozzle body, a plurality of side paths defined between the faces and the inner wall of the housing, and a spurt hole defined at a second end portion of the nozzle body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO LTDGYEONGSANGNAM-DO 51711

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Park, Byung Sung Incheon, KR 8 11
Park, Sung Won Gyeonggi-do, KR 68 306
Park, Yong Hae Busan, KR 12 19
You, Seon Jae Seoul, KR 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00