System for multiple energy storage and management and method of making same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9809128
SERIAL NO

14562042

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A propulsion system includes an electric drive, a first energy storage system electrically coupled to the electric drive through a DC link, and a second energy storage system electrically coupled to the first energy storage system in a series connection. The first energy storage system comprises a high specific-energy storage device and the second energy storage system comprises a low specific-power storage device. The propulsion system also includes a third energy storage system comprising a high specific-energy storage device electrically coupled to the second energy storage system. A bi-directional boost converter is electrically coupled to the second and third energy storage systems such that a terminal of the third energy storage system is electrically coupled to a low voltage side of the bi-directional boost converter and a terminal of the second energy storage system is coupled to a high voltage side of the bi-directional boost converter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GENERAL ELECTRIC COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berry, Irene Michelle Schenectady, US 17 175
Gemin, Paul Robert Nishayuna, US 52 549
King, Robert Dean Schenectady, US 159 4593

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00