Desalination system and desalination method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9809463
APP PUB NO 20150060260A1
SERIAL NO

14534568

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A desalination system, etc. of the present disclosure includes: a water tank; a water-repellent particle layer that is located below the water tank and contains a plurality of water-repellent particles; a liquefying layer that is located below the water-repellent particle layer and liquefies water vapor that has passed through the water-repellent particle layer, to obtain fresh water; an introduction channel of a liquid supply channel that supplies a liquid to the water tank; and a liquid speed reduction part that is located on the introduction channel of the supply channel, and includes a wall surface crossing a flow direction of the liquid in the supply channel, for reducing a flow speed of the liquid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD22-6 MOTO-MACHI KADOMA-SHI OSAKA 5710057 ?5710057

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gyoten, Hisaaki Osaka, JP 57 642
John, Stephen William Kyoto, JP 44 120
Mino, Norihisa Osaka, JP 131 1238
Ono, Atsushi Kyoto, JP 143 1499
Taomoto, Akira Kyoto, JP 31 186
Tomiyama, Morio Nara, JP 59 140

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00