Compositions containing kiln dust and/or biowaste ash and methods of use

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9809737
SERIAL NO

13769442

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An embodiment comprises a method of treating a subterranean formation comprising: providing a treatment fluid comprising a kiln dust, biowaste ash, and water; and introducing the treatment fluid into a subterranean formation. Another embodiment comprises a method of cementing comprising: introducing a cement composition into a subterranean formation, wherein the cement composition comprises a kiln dust, biowaste ash, and water; and allowing the cement composition to set in the subterranean formation. Yet another embodiment comprises a method comprising: providing a spacer fluid comprising biowaste ash and water; introducing the spacer fluid into a well bore to displace at least a portion of a first fluid from the well bore; and introducing a cement composition into the well bore, wherein the spacer fluid separates the cement composition and the first fluid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HALLIBURTON ENERGY SERVICES, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benkley, James R Duncan, US 18 557
Brenneis, D Chad Marlow, US 112 5982
Morgan, Ronnie G Waurika, US 56 2185
Roddy, Craig W Duncan, US 130 8701

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00