Arrangement of flow structures for use in high differential pressure electrochemical cells

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9809890
APP PUB NO 20140027272A1
SERIAL NO

13947256

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure is directed towards flow structures in electrochemical cells for use in high differential pressure operations. The flow structure on the low pressure-side of the cell has a larger surface area than the flow structure on the high-pressure side of the cell at the flow structure—MEA interface. The boundary of the high pressure flow structure is entirely within the boundary of the low pressure flow structure. A seal around the high pressure flow structure is also contained within the boundary of the low pressure flow structure. In such an arrangement, high fluid pressures acting on the electrolyte membrane from the high-pressure side of the cell is fully and continuously balanced by the flow structure on the low pressure-side of the membrane. Use of the low pressure flow structure as a membrane support prevents the rupture or deformation of the membrane under high stresses.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NUVERA FUEL CELLS, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blanchet, Scott Chelmsford, US 67 305
Lunt, Benjamin Tewksbury, US 10 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00