Power generation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9810089
APP PUB NO 20150345340A1
SERIAL NO

14653465

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This power generation system (20A) includes a plurality of power generation units (50A, 50B, 50C, . . . ) which are provided in parallel, wherein each of the power generation units (50A, 50B, 50C, . . . ) includes an expander (26) configured to be rotated by a working medium, a power generator (28) configured to generate power through rotation of the expander (26), a rectifier (29), a medium circulation system (22) configured to pump the working medium into the expander (26), a relay (70) configured to interrupt power between the power generator (28) and an external power system (30), an operating unit (40A, 40B) configured to be operated when maintenance starts, and a relay driving unit (71) configured to interrupt power between the power generator (28) and the external power system (30) by the relay (70) when the operating unit (40A, 40B) has been operated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI HEAVY INDUSTRIES, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirao, Toyotaka Tokyo, JP 13 266
Kobayashi, Naoki Tokyo, JP 399 4887
Kubota, Yutaka Tokyo, JP 44 345
Sakurai, Takao Tokyo, JP 52 594

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00