Power management control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9811130
SERIAL NO

13611999

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system to control a power distribution system includes a system controller configured to determine an allocation of power during a first time period for each of a plurality of subsystems. The system also includes a subsystem controller communicatively coupled to the system controller. The subsystem controller is associated with a device and configured to receive power allocation data indicating the allocation of power for the device from the system controller. The subsystem controller is further configured to receive operation request data indicating a request to operate the device and produce a model operation of the device for a second time period based on the power allocation data, the operation request data, and a cost-utility function associated with the device. The subsystem controller is also configured to communicate, to the system controller, projected power demand data associated with the modeled operation of the device during the second time period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THE BOEING COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fu, Sheau-Wei J Bellevue, US 2 25
Karimi, Kamiar J Kirkland, US 57 583
Mesbahi, Mehran Seattle, US 1 23
Zelazo, Daniel Haifa, IL 1 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00