Compact integral pressurized water nuclear reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9812225
SERIAL NO

13085527

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pressurized water reactor (PWR) includes a cylindrical pressure vessel defining a sealed volume, a nuclear reactor core disposed in a lower portion of the cylindrical pressure vessel, one or more control rod drive mechanisms (CRDMs) disposed in the cylindrical pressure vessel above the nuclear reactor core, and an annular steam generator surrounding the nuclear reactor core and the CRDM. In some such PWR, a cylindrical riser is disposed coaxially inside the pressure vessel and inside the annular steam generator and surrounds the nuclear reactor core and the CRDM, and the steam generator is disposed coaxially inside the cylindrical pressure vessel in an annular volume defined by the cylindrical pressure vessel and the cylindrical riser. In other such PWR, the steam generator is disposed coaxially outside of and secured with the cylindrical pressure vessel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BWXT MPOWER INC11525 N COMMUNITY HOUSE RD SUITE 600 CHARLOTTE NC 28277

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Edwards, Michael J Forest, US 44 259
Malloy, John D Goode, US 16 248

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00