Closed loop data center and organic life ecosystem

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9812925
SERIAL NO

14335874

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Processing units and electrical power generation are integrated with a botanical environment to form a closed loop system whereby the outputs of one component serve as the inputs of another. Additionally, humans can be added to the system while maintaining the closed loop nature. Heat generated by the electrical power generation and processing units aids in the growth of botanicals and in the conversion of waste organic materials into both fertilizer and fuel for the electrical power generation. Additionally, carbon dioxide output by the electrical power generation is consumed by the botanicals, which, in turn, output oxygen consumed by the electrical power generation. Water is obtained by passing the exhaust of the electrical power generation across condenser coils, and is utilized for adiabatic cooling, as well as a heat transfer medium. Water is also consumed by the botanicals, aiding their growth.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MICROSOFT TECHNOLOGY LICENSING, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Belady, Christian L Mercer Island, US 207 4891
James, Sean Olympia, US 16 230
Janous, Brian Issiquah, US 10 182

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00