Power conversion system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9812992
SERIAL NO

15109594

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a power conversion system in which one or more converter cells are connected in series to form an arm for each phase, a control device includes a voltage command generating unit for generating a positive arm voltage command and a negative arm voltage command for each phase. The voltage command generating unit includes an AC current control unit, a circulating current control unit, and a command distributing unit. On the basis of inputted voltage commands, the command distributing unit subtracts voltage drop portions due to inductance values in the arms from respective voltages assigned as outputs of the positive arm and the negative arm, to distribute voltage components, thereby determining the positive arm voltage command and the negative arm voltage command.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI ELECTRIC CORPORATION;TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Toshiyuki Chiyoda-ku, JP 89 397
Funahashi, Sadao Chuo-ku, JP 10 115
Higashi, Kotaro Chuo-ku, JP 10 95
Hosokawa, Yasuhiko Chuo-ku, JP 31 216
Mori, Osamu Chiyoda-ku, JP 85 825
Mukunoki, Kaho Chiyoda-ku, JP 14 97
Tamai, Shinzo Chuo-ku, JP 30 271

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00