Conveyor belt having a tensile member comprising cables

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9815628
SERIAL NO

14916575

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conveyor belt includes a first outer sheet disposed on a loadbearing side of the conveyor belt, a second outer sheet disposed on a drive side of the conveyor belt, and an embedded tension-member system disposed between the two sides, which is in the form of cords running parallel in the longitudinal direction of the conveyor belt. The tension-member system includes steel and, prior to vulcanization of the conveyor belt, an expandable coating which, after vulcanization of the conveyor belt, has a pore structure provided to at least portions of the tension-member system. The sheets are formed from a polymeric material with resilient properties. In some aspects, the volume of the coating after vulcanization is from 30 to 5000% higher than prior to vulcanization. The coating may contain at least one of a blowing agent and/or microbeads.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CONTITECH DEUTSCHLAND GMBHCONTINENTAL-PLAZA 1 HANNOVER 30175

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dreier, Marius Katlenburg, DE 3 9
Lotz, Florian Brevörde, DE 8 23
Sickmüller, Uwe Uhlstedt-Kirch, DE 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00