MEMS device and corresponding micromechanical structure with integrated compensation of thermo-mechanical stress

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9815687
SERIAL NO

15085901

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A micromechanical structure of a MEMS device, integrated in a die of semiconductor material provided with a substrate and having at least a first axis of symmetry lying in a horizontal plane, has a stator structure, which is fixed with respect to the substrate, and a rotor structure, having a suspended mass, mobile with respect to the substrate and to the stator structure as a result of an external action, the stator structure having fixed sensing electrodes capacitively coupled to the rotor structure; a compensation structure is integrated in the die for compensation of thermo-mechanical strains. The compensation structure has stator compensation electrodes, which are fixed with respect to the substrate, are capacitively coupled to the rotor structure, and are arranged symmetrically to the fixed sensing electrodes with respect to the first axis of symmetry.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STMICROELECTRONICS INTERNATIONAL N VGENEVA SWITZERLAND

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Merassi, Angelo Antonio Caponago, IT 10 106

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00