Apparatus, systems, and methods for pre-heating feedstock to a melter using melter exhaust

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9815726
SERIAL NO

14844198

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Feedstock supply structure apparatus, including an exhaust conduit fluidly and mechanically connectable to a structure defining a melting chamber, the exhaust conduit positioned at an angle to vertical ranging from 0 to about 90 degrees. The exhaust conduit may include a heat exchange substructure, or the conduit itself may serve as a heat exchanger. A feedstock supply structure fluidly connected to the exhaust conduit. Systems include a structure defining a melting chamber and an exhaust conduit fluidly connected to the structure. The exhaust conduit includes a heat exchange substructure for preheating the feedstock. Methods include supplying a granular or pellet-sized feedstock to the melter exhaust conduit, the exhaust conduit including the heat exchange substructure, and preheating the feedstock by indirect or direct contact with melter exhaust in the heat exchange substructure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JOHNS MANVILLE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huber, Aaron Morgan Castle Rock, US 46 928

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00