Polyisocyanurate based cement for wellbore fluid loss prevention

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9815739
SERIAL NO

14928108

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides an oil or gas wellbore polymeric cement comprising the reaction product of an aliphatic isocyanate, a trimerization catalyst, and a catalyst retarder, wherein the reaction occurs in the wellbore at a temperature of at least 250° F. (121° C.). Also provided is a method of reducing fluid loss from an oil or gas well, comprising producing a polyisocyanurate cement by combining an aliphatic isocyanate, a trimerization catalyst, and a catalyst retarder within a wellbore at a temperature of at least 250° F. (121° C.). The various embodiments of the invention meet the controllability and minimized toxicity needed for this application. Standard aliphatic polyisocyanates reduce handling concerns while providing the reactivity response that fits this temperature range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COVESTRO LLC1 COVESTRO CIRCLE PITTSBURGH PA 15205

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jeffries, Michael K Follansbee, US 22 183
Zielinski, David P Wexford, US 27 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00