Pre-fabricated construction panels

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9816265
SERIAL NO

15023184

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pre-fabricated construction panel (100) for use on an external surface and/or as part of a building or construction is provided. The panel comprises at least a first layer (110) which is at least partially provided from thermally insulating material having a first surface, said panel comprising at least a second layer (120), said at least second layer being provided from fiber cement board said second layer having a second surface facing said first surface, said first and second layers being connected one to the other by a spacing means located between and adhering to said first and said second surface, which spacing means provides at least one interspace (140) between the first and second surface, said at least one interspace having at least two openings to the external of said panel for enabling air to flow into and out of the interspace towards the external of said panel. The thermally insulating material means material has a thermal conductivity (lambda) less than or equal to 0.05 W/mK.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ETEX SERVICES NV1880 KAPELLE-OP-DEN-BOS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Vermeren, Frans Buggenhout, BE 1 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00