Waste heat recovery system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9819193
SERIAL NO

15031065

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Connected in parallel to an expander and a condenser of a Rankine cycle are n sets each including a different expander and a different condenser. Devices are provided for stopping operations of the expanders in sets connected in parallel, and a pressure sensor and a temperature sensor are installed respectively in an inlet and outlet of an evaporator. An electronic control unit sets or releases at least one of the operation stopping devices such that a measured value of the temperature sensor reaches a prescribed temperature value which is equal to or less than a thermal decomposition temperature of a refrigerant and which is set in advance, and the electronic control unit controls a rotational speed of a refrigerant pump such that a measured value of the pressure sensor reaches a prescribed pressure value set in advance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ISUZU MOTORS LIMITED2-5 TAKASHIMA 1-CHOME NISHI-KU YOKOHAMA-SHI KANAGAWA 220-8720

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abe, Makoto Yokohama, JP 179 1636

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00