Power conversion device, motor including the same, air conditioner having the motor incorporated therein, and ventilation fan having the motor incorporated therein

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9819297
SERIAL NO

13822257

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power conversion device includes a printed circuit board, whose mounting surface is opposite to an annular surface formed by an annular stator that constitutes a motor, arranged to be separated from the annular surface with a predetermined distance, and mounted with a Hall element that detects a rotation position of a rotor of the motor on a mounting surface on a side of the stator; an inverter IC that is mounted on the mounting surface on the side of the stator of the printed circuit board to supply a high-frequency current to the stator; and an overheat detection unit that is mounted on the mounting surface on the side of the stator of the printed circuit board and detects an overheated state of the inverter IC. When the overheat detection unit detects an overheated state, the inverter IC restricts or stops a current to be supplied to the stator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI ELECTRIC CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hasegawa, Tomoyuki Tokyo, JP 19 117
Ishii, Hiroyuki Tokyo, JP 503 6269
Yamada, Michio Tokyo, JP 21 291
Yamamoto, Mineo Tokyo, JP 67 365

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00