Gimbal mount for a sensor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9819868
APP PUB NO 20170048439A1
SERIAL NO

15306401

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gimbal mount for a sensor having an outer and inner gimbal mount to stabilize vibrations in a wide frequency band without having to statically balance the sensor. A direct drive is provided for at least one drive of an outer axis of rotation of the outer gimbal mount and an amplified piezo actuator is provided for at least one drive of an inner axis of rotation of the inner gimbal mount. The at least one outer axis of rotation is provided for vibration stabilization in a first range of the frequency band to be stabilized and the at least one inner axis of rotation stabilization is provided for vibration stabilization in a second range in the frequency band to be stabilized. The outer gimbal mount and the inner gimbal mount are embodied as mechanically rigid constructions which transmit vibrations in the frequency band to be stabilized essentially without damping.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DYNAMIC PERSPECTIVE GMBHWEHLISTRASSE 29/STIEGE 1/HOF TOP 1 A-1200 WIEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morawitz, Stefan Vienna, AT 1 14
von, Borcke-Morawitz Peter Vienna, AT 1 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00