Footwear including an incline adjuster

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9820531
SERIAL NO

14725218

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sole structure may include chambers and a transfer channel containing an electrorheological fluid. Electrodes may be positioned to create, in response to a voltage across the electrodes, an electrical field in at least a portion of the electrorheological fluid in the transfer channel. The sole structure may further include a controller including a processor and memory. At least one of the processor and memory may store instructions executable by the processor to perform operations that include maintaining the voltage across the electrodes at one or more flow-inhibiting levels at which flow of the electrorheological fluid the through the transfer channel is blocked, and that further include maintaining the voltage across the electrodes at one or more flow-enabling levels permitting flow of the electrorheological fluid through the transfer channel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIKE INCONE BOWERMAN DRIVE BEAVERTON OR 97005

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Chin-yuan Kirkland, US 17 188
Walker, Steven H Camas, US 149 2995

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00