Hydraulic control device and construction machinery including same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9821840
APP PUB NO 20140318116A1
SERIAL NO

14364018

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydraulic control device includes: a hydraulic pump connected in parallel to steering and boom cylinders; a steering control valve that controls the direction of operating oil flowing through the steering cylinders; a boom control valve that connects the hydraulic pump to a tank when the valve is at a neutral position and controls the direction of the oil flowing through the boom cylinders when the valve is at an offset position; a meter-in pressure compensator that increases flow rate of the oil flowing through a variable restrictor of the steering control valve in accordance with pressure in front of and behind the restrictor; and a bleed-off pressure compensator that decreases flow rate of the oil flowing through the boom control valve in accordance with the increase in pressure of the oil flowing through the steering cylinders to maintain the predetermined pressure of the oil in the steering control circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY CO LTD16-1 HIGASHIUENO 2-CHOME TAITO-KU TOKYO 110-0015

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujiyama, Kazuto Kobe, JP 14 57
Ito, Makoto Kobe, JP 297 2381
Kodera, Hiroyasu Kobe, JP 11 34
Tanaka, Shinichiro Kakogawa, JP 82 814
Yamamoto, Ryo Kobe, JP 81 519

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00