Construction system for subway station

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9822506
APP PUB NO 20150211205A1
SERIAL NO

14608249

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described herein is a construction system for a subway station, wherein the construction of guide walls is accomplished using a guide wall steel formwork system, the construction of support beams is accomplished using a support beam steel formwork system, the construction of sidewalls is accomplished using a sidewall trolley, and the construction of floor slabs is accomplished using a floor slab trolley.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GUANGZHOU JISHI CONSTRUCTION GROUP CO., LTD.;GUANGZHOU XINQIAO CONSTRUCTION SERVICE CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Muzhen Guangzhou, CN 1 0
Ding, Changyin Guangzhou, CN 1 0
He, Bingquan Guangzhou, CN 1 0
He, Dengjia Guangzhou, CN 1 0
Huang, Pingyu Guangzhou, CN 1 0
Jiang, Mingxi Guangzhou, CN 1 0
Ke, Dehui Guangzhou, CN 1 0
Lei, Xiongwu Guangzhou, CN 1 0
Li, Wenlong Guangzhou, CN 150 4519
Li, Wenxian Guangzhou, CN 5 55
Li, Yuqi Guangzhou, CN 6 24
Mo, Jin Guangzhou, CN 1 0
Qin, Jianxin Guangzhou, CN 2 0
Qiu, Jiantao Guangzhou, CN 1 0
Qiu, Shiliang Guangzhou, CN 1 0
Tang, Weicai Guangzhou, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00