Tubular component for drilling and operating hydrocarbon wells, and resulting threaded connection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9822591
SERIAL NO

13260138

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tubular component for a threaded connection includes at one of its ends a threaded zone. The end includes a terminal surface and the threaded zone includes, over at least a portion, threads including, when viewed in a longitudinal section passing through an axis of the tubular component, a thread crest, a thread root, a load flank, and a stabbing flank, such that a respective axial width of thread crests decreases in a direction of the terminal surface while a respective axial width of thread roots increases when considered in the same direction. At least one of a profile of the load flank and a profile of the stabbing flank of a thread portion includes, as a contral portion, a continuous curve provided with a point of inflection such that the profile with the point of inflection in convex at the thread crest and concave close to the thread root.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUMITOMO METAL INDUSTRIES, LTD.;VALLOUREC OIL AND GAS FRANCE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Caron, Olivier Ramecourt, FR 6 38
Granger, Scott Valenciennes, FR 11 48
Verger, Eric Gommegnies, FR 25 274

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00