Secondary dampening assembly for shock absorber

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9822837
SERIAL NO

15017056

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A shock absorber assembly includes a pressure tube having an upper end and a lower end and defining an interior, a rod guide disposed adjacent the upper end, a first compression valve assembly adjacent the lower end, a rod operatively coupled to the pressure tube having a first end and a second end, an extender coupled to the second end of the rod, a piston assembly coupled to the extender between the rod guide and the first compression valve assembly with the piston assembly disposed within the interior and slideably coupled to the pressure tube, with the piston assembly dividing the interior into an upper and a lower working chamber, a second compression valve assembly coupled to the extender between the piston assembly and the first compression valve assembly, and a cup disposed within the lower working chamber and defining a bore shaped to receive the second compression valve assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TENNECO AUTOMOTIVE OPERATING COMPANY INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benson, William Thomas Toledo, US 1 16
Groves, Gary W Toledo, US 13 202

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00