Ultra-wide band measurement bridge

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9823284
SERIAL NO

14398418

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A measuring bridge (1) provides a first matching pad (2), a second matching pad (3) and a third matching pad (4), wherein all matching pads (2, 3, 4) comprise at least three resistors (21, 22, 23, 31, 32, 33, 41, 42, 43) which are arranged in a T-structure. A second resistor (32) of the second matching pad (3) is connected to a second resistor (22) of the first matching pad (2), and a third resistor (43) of the third matching pad (4) is connected to a third resistor (23) of the first matching pad (2). A second resistor (42) of the third matching pad (4) can be connected to a device under test (7). A third resistor (33) of the second matching pad (3) can be connected to a calibration standard (5), and a first resistor (31, 41) of the second and the third matching pad (3, 4) are connected in each case to a signal input of an element (11) which suppresses a common-mode component on its two signal inputs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROHDE & SCHWARZ GMBH & CO. KG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Leibfritz, Martin Munich, DE 26 42
Sterns, Michael Nuremberg, DE 9 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00