Optical device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9825248
SERIAL NO

14780491

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical device (10) includes a joining structure in which a first conductive film (110) and a second conductive film (130) are joined to each other. The first conductive film (110) that constitutes the joining structure is constituted by a conductive material. The second conductive film (130) that constitutes the joining structure is constituted by a metal material. A part of the second conductive film (130) comes into contact with the first conductive film (110). A plurality of concave portions are provided in a contact surface of the second conductive film (130) which comes into contact with the first conductive film (110). The contact surface has a surface roughness greater than a surface roughness of a non-contact surface of the second conductive film (130) which does not come into contact with the first conductive film (110).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PIONEER CORPORATION;TOHOKU PIONEER CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akagi, Masanobu Yonezawa, JP 14 288
Okuyama, Kenichi Yonezawa, JP 20 180
Saito, Yuji Yonezawa, JP 222 1790
Shirahata, Kunihiko Yonezawa, JP 15 29
Tan, Hiroki Yonezawa, JP 28 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00