Bi-directional power converter for converting power between alternating current and direct current

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9825550
SERIAL NO

15340959

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bi-directional power converter includes a first terminal, a second terminal, a third terminal, a fourth terminal, a first converter, a second converter, a power driver, and a processor. The first converter is coupled to the first terminal and the second terminal for performing a conversion between a first alternating current and a first direct current. The second converter is coupled to the first converter for performing a conversion between a second alternating current and the first direct current. The power driver is coupled to the second converter, the third terminal and the fourth terminal for performing a conversion between the second alternating current and a second direct current. The processor is coupled to the first converter, the second converter, and the power driver for controlling the first converter, the second converter, and the power driver.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COTEK ELECTRONIC IND CO LTD33548 TAOYUAN CITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Wei-Kuang Taoyuan, TW 7 27
Wu, Chun-Wei Taoyuan, TW 55 171

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00