Incremental application of resources to network traffic flows based on heuristics and business policies

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9825868
SERIAL NO

15279289

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein are system, method, and computer program product embodiments for increasingly applying network resources to traffic flows based on heuristics and policy conditions. A network determines that a traffic flow satisfies a first condition and transmits a first portion of the traffic flow to a network service. A network service then inspects the first portion of the traffic flow at a first level of detail and determines that the traffic flow satisfies a second condition. The network can then transmit a second portion of the traffic flow to the network service based on the determining the traffic flow satisfies the second condition. The network service can inspect the second portion of the traffic flow at a second level of detail, wherein the inspecting at the second level of detail requires a different amount of computing resources than the inspecting at the first level of detail.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LEVEL 3 COMMUNICATIONS, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Caputo,, II Pete Joseph Highlands Ranch, US 25 157
Sella, William Thomas Parker, US 42 290

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00