Entry sheet for drilling and drilling method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9826643
APP PUB NO 20150125228A1
SERIAL NO

14387206

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is an entry sheet for drilling that, compared with a conventional entry sheet for drilling, has better hole position accuracy, can suppress drill bit breakage, and exhibits less processing chips wrapping around the drill bit. This entry sheet for drilling includes a metallic support foil and a layer comprising a resin composition that is formed on at least one surface of the metallic support foil, wherein the resin composition contains a cellulose derivative (A) and a water-soluble resin (B), the cellulose derivative (A) includes a hydroxyalkyl cellulose and/or a carboxyalkyl cellulose having a weight average molecular weight of 20,000 to 350,000, and based on 100 parts by mass of the resin composition, the content of the cellulose derivative (A) is 5 to 40 parts by mass and the content of the water-soluble resin (B) is 60 to 95 parts by mass.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI GAS CHEMICAL COMPANY INCMITSUBISHI BUILDING 5-2 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8324

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hasaki, Takuya Yonezawa, JP 11 81
Ihara, Katsutoshi Yonezawa, JP 1 8
Sugimoto, Noriaki Yonezawa, JP 10 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00