Mineral separation using sized-, weight- or magnetic-based polymer bubbles or beads

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9827574
SERIAL NO

14117534

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatus for use in, or forming part of, a separation process to be implemented in separation processor technology, the apparatus comprising synthetic bubbles or beads configured with a polymer or polymer-based material functionalized to attach to a valuable material in a mixture so as to form an enriched synthetic bubbles or beads having the valuable material attached thereto, and also configured to be separated from the mixture based at least partly on a difference in a physical property between the enriched synthetic bubbles or beads having the valuable material attached thereto and the mixture.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CIDRA CORPORATE SERVICES INC50 BARNES PARK NORTH WALLINGFORD CT 06492

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adamson, Douglas H Mansfield Center, US 34 339
Didden, Francis K Wallingford, US 17 101
Fernald, Mark R Enfield, US 99 1865
Kersey, Alan D South Glastonbury, US 186 4756
O'Keefe, Christian V Durham, US 21 572
Rothman, Paul J Windsor, US 45 136

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00