Heat exchanger and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9827638
SERIAL NO

14791478

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Each heat exchange tube of a condenser is formed of a first brazing sheet having a core material and a first brazing material covering the core material. The tank body of each header tank is formed of a second brazing sheet having a core material and a third brazing material covering the core material and being lower in flowability than the first brazing material. In a region of a surface of each protrusion portion facing the corresponding heat exchange tube, the region having a predetermined width as measured from the projecting end, the core materials of the two brazing sheets are brazed together by means of the first brazing material. In the region other than the brazed portion, the core materials of the two brazing sheets are brazed together by means of a fillet formed of a mixture of the first and third brazing materials.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAHLE INTERNATIONAL GMBH70376 STUTTGART

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiba, Kengo Oyama, JP 1 1
Nakata, Yoshinori Oyama, JP 43 690
Saito, Takahisa Oyama, JP 11 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00