Composite feedstock for recovery of hydrocarbons from hydrocarbonaceous material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9828551
APP PUB NO 20150027930A1
SERIAL NO

14444654

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of reducing settling of residual comminuted hydrocarbonaceous material during processing can comprise forming a constructed permeability control infrastructure which defines a substantially encapsulated volume; introducing a composite comminuted hydrocarbonaceous material into the control infrastructure to form a permeable body, said composite hydrocarbonaceous material comprising a comminuted hydrocarbonaceous material and a structural material; and heating the permeable body sufficient to remove hydrocarbons therefrom such that the hydrocarbonaceous material is substantially stationary during heating, exclusive of subsidence and settling. The structural material can provide structural integrity to the permeable body sufficient to maintain convective flow of fluids throughout the permeable body during heating.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RED LEAF RESOURCES INC32 WEST 200 SOUTH #552 SALT LAKE CITY UT 84101

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Patten, James W South Jordan, US 38 445

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00