Methods of forming earth-boring tools

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9828809
APP PUB NO 20140013670A1
SERIAL NO

14030820

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods of forming composite particles include forming a source material over a plurality of nucleation cores and forming a catalyst material over the source material. Compositions of matter include a plurality of composite particles, each particle of the plurality comprising a plurality of nucleation cores, a source material disposed over the nucleation cores, and a catalyst material disposed over the source material. Methods of forming earth-boring tools include forming a plurality of composite particles, combining the plurality of composite particles with a plurality of grains of hard material, and catalyzing the formation of inter-granular bonds between the composite particles and the grains of hard material to faun a polycrystalline material. The plurality of in situ nucleated grains of hard material and the plurality of grains of hard material may be interspersed and inter-bonded.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAKER HUGHES HOLDINGS LLC17021 ALDINE WESTFIELD ROAD HOUSTON TX 77073

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
DiGiovanni, Anthony A Houston, US 132 2037
Scott, Danny E Montgomery, US 163 5114

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00