Switch valve and shower head applied with the switch valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9829116
APP PUB NO 20170056897A1
SERIAL NO

14837517

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switch valve includes a fixation portion and a water diversion plate, the fixation portion, a water diversion cavity connected to an inlet waterway, at least two diversion waterways, and a water diversion plate. A universal driving shaft is rotatably connected to the fixation portion and is inserted to the water diversion cavity. The driving mechanism is connected to the universal driving shaft. The water diversion plate and the universal driving shaft rotate synchronously. The bottom of the water diversion cavity is fixedly disposed with a first gear ring. The water diversion plate is fixedly disposed with a second gear ring which engages with the first gear ring. When the driving mechanism drives the water diversion plate to rotate in a preset angle, it slides along the universal driving shaft. The inlet waterway is switched to connect to the diversion waterways by the rotation of the water diversion plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • XIAMEN SOLEX HIGH-TECH INDUSTRIES CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gong, Hailang Fujian, CN 11 35
Wang, Shigang Fujian, CN 12 28
Xu, Wencong Fujian, CN 4 28
Zhou, Huasong Fujian, CN 113 1042

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00