Supervisory process control and manufacturing information system application having an extensible component model

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9829881
SERIAL NO

14520073

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A template-based supervisory process control and manufacturing information application development facility is disclosed that includes a number of time-saving application development tools that significantly enhance design productivity and allow re-using of previously developed application building blocks. The development facility includes an application object template library that stores a set of previously defined application object templates. The template library is accessed by developers through a configuration utility that facilitates specifying instances of the set of previously defined application object templates to be included in an application. Thereafter, application objects are instantiated from the selected ones of the set of previously defined application object templates in a build of the specified application.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHNEIDER ELECTRIC SOFTWARE LLC26561 RANCHO PARKWAY SOUTH LAKE FOREST CA 92630

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Erickson, Brian Long Beach, US 18 599
LeBlanc, Laurence G York, US 8 514
McIntyre, James P Aliso Viejo, US 21 820
Mody, Pankaj H Laguna Niguel, US 24 1322
Resnick, Robert M Fountain Valley, US 23 1100
Sowell,, Sr Timothy Lake Forest, US 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00