Combo crop harvester crop transfer means

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9832930
SERIAL NO

14912814

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system conveying material-other-than-grain (MOG) from a harvesting machine to a packaging machine towed by the harvesting machine. The system includes an joint pivotably joining a harvesting machine hitch to a packaging machine hitch. An accelerator is mounted to the packaging machine hitch. The accelerator has a housing with a top-side inlet and a side outlet. A MOG-propelling disk is disposed in the housing and is rotatable about an axis. A conduit is disposed above the packaging machine hitch and has an inlet end and an outlet end, the inlet end coupled to the side outlet. The conduit has first and second opposing side portions and a top side portion without an opposing bottom portion, with at least part of the top side portion is parallel with the plane of the disk. The accelerator, conduit, and packaging machine are collectively in pivotal arrangement relative to the harvesting machine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AGCO CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Herron, Maynard M Hesston, US 29 279

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00