Extracting-squeezing-compressing equipment used for municipal solid waste mixture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9833961
SERIAL NO

14518249

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure encompasses a machine for extracting, squeezing, compressing and compacting a mixture of municipal solid waste to provide both an organic-rich liquid and solid RDF pellets, separately. The machine comprises a stepless hydraulic power transmission module and a press and squeeze compression module. The body of the machine comprises a waste-inlet on one end, followed by a water separation zone, a wet organic substance pressing zone, a heat and steam pressing zone, and an RDF molding and pelletizing zone. The machine also comprises a press-and-squeeze shaft having a conical cylindrical shape with an ascending diameter including a shaft body and a helix screw. The helix screw with multi-spiral forward steps and multi-spiral backward steps, with the spiral steps (distance between and among them) becoming smaller toward the bigger end of the body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ORION ENTERPRISE INTERNATIONAL LLC1861 PUDDINGSTONE DR LA VERNE CA 91750

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Long, Nguyen Gia Ha Noi, VN 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00