H-section steel and method of producing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9834931
SERIAL NO

14761186

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An H-section steel has a predetermined chemical composition in which a thickness of a flange is 100 mm to 150 mm, at a strength evaluation position an area fraction of bainite in a steel structure is 80% or more, yield strength or 0.2% proof strength is 450 MPa or more, tensile strength is 550 MPa or more and 680 MPa or less, at a toughness evaluation position an average austenite grain size in the steel structure is 150 μm or less, and (Mg, Mn)S having a particle size of 0.005 μm to 0.5 μm is included at a density of 1.0×105 pieces/mm2 to 1.0×107 pieces/mm2.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATION6-1 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8071

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoshino, Manabu Kimitsu, JP 44 82
Ichikawa, Kazutoshi Kimitsu, JP 14 29
Mitsuyasu, Kazuaki Osaka, JP 7 11
Mizoguchi, Masaki Kimitsu, JP 13 28
Sugiyama, Hirokazu Tokyo, JP 36 115

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00