Rock bolt

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9835030
SERIAL NO

14762119

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Rock bolt (1) comprising at least an elongated body (4), one end of which comprises at least a first external conical portion (16) extending through at least one hole (12) in at least a cylindrical expandable body (5), the hole (12) over a section of the bore hole in the axial direction comprises an internally conical part (15) intended to cooperate with the elongate member outer conical portion (16). Upon relative movement of the elongate body (4) and the expandable body (5) in one direction expands the expandable body in the radial direction. The relative axial movement between the elongated body (4) and the expandable body (5) is provided by at least one tensioning device (7). The rock bolt comprises at least one wedge device (2), which in use of the rock bolt, is connected to the expandable body (5) hole (12) and at least partially inserted between a first portion (17) and at least a second part (18). The rock bolt further comprises at least one connecting means (21).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Våhlström, Ola Malmberget, SE 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00