Industrial vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9835185
APP PUB NO 20150275936A1
SERIAL NO

14666541

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydraulic mechanism is mounted on a forklift. The hydraulic mechanism has a control valve and a pressure compensation circuit for compensating pressure within the hydraulic mechanism. The pressure compensation circuit has a relief pressure valve and an unloading valve for releasing pressure within the pressure compensation circuit to a discharge oil passage. Upon instructed to perform cargo handling operation, the unloading valve is switched to an open state, and the relief pressure valve is thereby actuated, so that rapid increase of pressure within the circuit is avoided. Further, the unloading valve is switched to an open state, and the pressure within the hydraulic mechanism is thereby released to the discharge oil passage, so that the cargo handling operation by the tilt cylinder and the lift cylinder is restricted.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NISHINA INDUSTRIAL CO., LTD.;KABUSHIKI KAISHA TOYOTA JIDOSHOKKI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goto, Tetsuya Kariya, JP 123 1820
Hagino, Kenichi Kariya, JP 4 4
Koyama, Takahiro Nagano, JP 73 429
Nakajima, Shigeto Nagano, JP 18 93
Takano, Satoshi Nagano, JP 152 1875

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00