Control system for construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9835187
APP PUB NO 20150152900A1
SERIAL NO

14406535

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system for a construction machine includes: a boom cylinder; a boom switching valve; a fluid pressure motor adapted to drive a motor generator by being rotated by means of a return fluid guided from a piston side chamber; a regeneration control valve adapted to adjust a first supply amount serving as a supply amount of a working fluid supplied from the piston side chamber to the boom switching valve, and a second supply amount serving as a supply amount of the working fluid supplied from the piston side chamber to the fluid pressure motor; and a controller adapted to control the regeneration control valve so that the second supply amount becomes smaller than the first supply amount in a case where a stroke amount of a spool becomes an upper limit value or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KYB CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Egawa, Masahiro Saitama, JP 37 168
Kawasaki, Haruhiko Kanagawa, JP 40 229
Yonehara, Yasuhiro Kanagawa, JP 7 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00