Planetary gear train for a wind power plant and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9835244
SERIAL NO

14917473

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A planetary gear train for a wind power plant includes a planetary stage rotating in a gear train housing, a spur gear stage downstream of the planetary stage, a sun wheel shaft which is non-rotatably connected to a sun wheel of the planetary gear stage, and a hollow shaft which is coaxially surrounded by a spur gear of the spur gear stage and is non-rotatably connected to the spur gear. The sun wheel shaft and the hollow shaft are non-rotatably connected to each other by a toothed coupling, with an outer toothing of the sun wheel shaft meshing with an inner toothing of the hollow shaft. The planetary gear train includes oil-guide ducts which produce a connection between an oil inlet connected to the gear train housing, on the one hand, and the toothed coupling and the axial contact surface, on the other hand.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FLENDER GMBH46395 BOCHOLT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deitmers, Michael Stadtlohn, DE 2 7
Möllendorf, Ralf Mülheim, DE 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00