Multi-ply heterogeneous armor with viscoelastic layers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9835416
SERIAL NO

13085130

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An armor system with a composite laminate having at least four alternating layers (two bi-layers) of a first material and a second material, the first material having a lower acoustic impedance than the second material. The first material is an elastomer and the second material can be a hard material such as steel, aluminum, or ceramic, or an elastomer with a higher acoustic impedance than the first material. The laminate can include many alternating layers of the first and second materials, and can be adhered or affixed to a thicker armor substrate. Additional protective elements such as corrugated metal-ceramic panels and armored glass cylinders can be added to improve resistance to armor piercing rounds, explosively formed penetrators, or other threats.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NAVY THE GOVERNMENT OF THE UNITED STATES OF AMERICA AS REPRESENTED BY THE SECRETARY OF THENAVAL RESEARCH LABORATORY 4555 OVERLOOK AVE SW CODE 1008 2 WASHINGTON DC 20375

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fragiadakis, Daniel M Alexandria, US 9 72
Gamache, Raymond M Indian Head, US 26 165
Roland, Charles M Waldorf, US 28 224

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00