Method of controlling a production process using prediction model output directly linking interacted probe radiation information with morphological process step control parameters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9836031
SERIAL NO

14376056

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of controlling a production process including a process step for the morphological modification of a bio-material matrix comprises obtaining digital input data acquired during each of a plurality of production runs of the process, which input data includes information from radiation within a portion of the electromagnetic or acoustic spectrum having interacted with the matrix at one or more locations within the process together with a process control parameter and production event data for the associated production run; generating in a computer a prediction model from a multivariate analysis of the digital input data, which model links the information directly with one or more of process control parameters, production run events and process control settings; and applying in the computer the prediction model to interacted information obtained from a new production run to generate as an output one or more of a process control parameter a process control event and a predicted production run event for the new production run for use in controlling the production process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FOSS ANALYTICAL A/SHILLEROED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Büchmann, Bo Frederiksberg, DK 2 8
Gregersen, Poul Copenhagen, DK 1 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00