Leg prosthesis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9839536
APP PUB NO 20140358249A1
SERIAL NO

14463229

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A leg prosthesis wherein the prosthesis shaft and the transtibial part are connected by a prosthesis shaft adapter. The prosthesis shaft adapter is constructed as a compact one-part component with a liner (sleeve as inner prosthesis shaft adapter) of the amputation stump and with a rearward extension for the prosthesis receptacle connection. The prosthesis shaft adapter is designed such that, in addition to the rearward extension of 1 cm to 10 cm, the prosthesis receptacle connection is also angled and laterally offset. Advantageously, the leg prosthesis according to the invention has a relatively low weight due to the prosthesis shaft adapter as a connecting element. The leg prosthesis operates absolutely safely and can be efficiently produced. The fabrication of a leg prosthesis with an individual biomechanical fit to the patient is significantly facilitated, which also results in fewer faulty prostheses.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OSSUR HF

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bergande, Stefan Beedenbostel, DE 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00