Dishwasher and control method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9839944
SERIAL NO

14738168

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control method of a dishwasher that includes at least two flow paths having different flow rates, a chamber having communication holes that each communicate with a respective flow path, a water supply pump configured to supply washing water to the chamber through an impeller rotated by a motor, and a flow path switching unit located within the chamber and configured to sequentially open the communication holes is described. The control method includes the actions of measuring an amount of current supplied to the motor while the motor rotates the impeller to supply washing water to the chamber, and determining a position of the flow path switching unit by comparing the amount of current supplied to the motor with reference current amounts that are each designated as an amount of current supplied to the motor when the motor rotates the impeller to supply washing water to the respective flow path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ELECTRONICS INC128 YEOUI-DAERO YEONGDEUNGPO-GU SEOUL 07336

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Seongho Seoul, KR 32 114
Lee, Jaechul Seoul, KR 19 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00