S

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9840675
SERIAL NO

14763924

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The system is provided with: a first heat exchanger which is interposed at an intersection between a rich solution supply line and a lean solution supply line, which has absorbed CO2 and H2S extracted from a bottom portion of an absorber, and a regenerated absorbent; a second heat exchanger which is interposed at an intersection between a semi-rich solution supply line and a branch line branched at the branch portion C from the lean solution supply line, and the lean solution; a merging portion which merges a branch line configured to supply the lean solution after heat exchange with the lean solution supply line; and a flow rate adjusting valve which is interposed in the lean solution supply line to adjust the distribution amount of the lean solution.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTD16-5 KONAN 2-CHOME MINATO-KU TOKYO 108-8215

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horizoe, Kouji Tokyo, JP 15 35
Ishida, Kazuo Yokohama, JP 59 550
Katou, Yuudai Tokyo, JP 4 7
Murakami, Moritoshi Tokyo, JP 21 96
Yushima, Masaki Hiroshima, JP 11 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00