Visualization of three-dimensional power distribution data

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9842426
SERIAL NO

14670927

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Exemplary methods and systems visualize or contour a power distribution system state by displaying to an operator output data values interpolated at output data locations from input data including distributed input data sensor locations in three dimensions and corresponding dynamically updated input data values. The method includes defining triangles in the volume, and determining, for each triangle, closest input data locations according to a closeness criteria. The method also includes projecting each triangle onto a visualization plane, and determining, for an output data location on the visualization plane at least one triangle, the projection of which includes the output data location. The method interpolates, for the output data location, the input data values of the closest input data locations of each of the at least one determined triangle to generate an output data value corresponding to the output data location.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ABB RESEARCH LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Larsson, Mats Baden-Dättwil, CH 70 768
Naef, Martin Niederrohrdorf, CH 3 119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00