Process for recovering carbon monoxide from catalytic fast pyrolysis product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9845246
SERIAL NO

14919881

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides an improved process for recovering CO from a catalytic fast pyrolysis (CFP) process product effluent. The process comprises the steps of: a) providing a first vapor phase stream resulting from a CFP process comprising, on a water-free and solids-free basis, from 25 to 80% CO and at least 15% CO2, b) mixing the first vapor phase stream of step a) with a particular solvent to make a mixed phase stream, c) separating the mixed phase stream of step b) into a second vapor phase stream comprising CO and a liquid phase stream, and d) recovering a product stream from the second vapor phase stream of step c) having a higher concentration of CO and a lower concentration of CO2 than the first vapor phase stream of step a).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANELLOTECH INC401 NORTH MIDDLETOWN ROAD NO 170A PEARL RIVER NY 10965

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schmelzer, Eugene Baltimore, US 7 49
Sorensen, Charles Haverstraw, US 13 64
Tanzio, Michael Cherry Hill, US 5 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00