Wind farm having a plurality of network feed-in points

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9845788
SERIAL NO

14410374

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wind farm comprises a plurality of wind turbines connected to a network internal to the wind farm, a network feed-in point in the network internal to the wind farm for feeding electrical power into a supply network, a control device associated with the network feed-in point designed to control the wind turbines feeding power into the supply network by the network feed-in point on the basis of measured values recorded at the network feed-in point, and at least one additional network feed-in point having an additional control device designed to control the wind turbines feeding power into the supply network by the additional network feed-in point on the basis of measured values recorded at the additional network feed-in point, wherein the network internal to the wind farm is designed to variably connect at least one wind turbine to one of the plurality of network feed-in points.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH20097 HAMBURG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schubert, Matthias Rendsburg, DE 23 204

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00